Iris D. Tommelein
#157,691
Most Influential Person Now
Researcher, ORCID id # 0000-0002-9941-6596
Iris D. Tommelein's AcademicInfluence.com Rankings
Iris D. Tommeleinengineering Degrees
Engineering
#6661
World Rank
#7997
Historical Rank
Civil Engineering
#333
World Rank
#397
Historical Rank
Applied Physics
#2174
World Rank
#2213
Historical Rank
Download Badge
Engineering
Iris D. Tommelein's Degrees
- PhD Civil Engineering University of California, Berkeley
- Masters Construction Engineering and Management Stanford University
Why Is Iris D. Tommelein Influential?
(Suggest an Edit or Addition)Iris D. Tommelein's Published Works
Published Works
- Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique (1998) (341)
- PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE (1999) (305)
- The foundations of lean construction (2002) (239)
- Dynamic layout planning using a hybrid incremental solution method (1999) (173)
- Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration (1999) (154)
- Interactive Dynamic Layout Planning (1993) (140)
- WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING (1999) (138)
- Value stream analysis of a re-engineered construction supply chain (2003) (136)
- Lean construction tools and techniques (2007) (109)
- Takt Time Planning for Construction of Exterior Cladding (2013) (101)
- SightPlan Experiments: Alternate Strategies for Site Layout Design (1991) (97)
- SightPlan Model for Site Layout (1992) (97)
- Understanding project success through analysis of project management approach (2014) (87)
- Work Structuring to Achieve Integrated Product-Process Design (2004) (84)
- DePlan: a tool for integrated design management (2004) (82)
- Is the Last Planner System Applicable to Design? A Case Study (2009) (77)
- Comparing AHP and CBA as Decision Methods to Resolve the Choosing Problem in Detailed Design (2015) (77)
- Parade Game: Impact of Work Flow Variability on Succeeding Trade Performance (1998) (76)
- More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes (1999) (73)
- Site‐Layout Modeling: How Can Artificial Intelligence Help? (1992) (69)
- VALUE STREAM ANALYSIS OF CONSTRUCTION SUPPLY CHAINS: CASE STUDY ON PIPE SUPPORTS USED IN POWER PLANTS (2002) (68)
- Lean management methods for complex projects (2012) (67)
- IMPROVEMENT ALGORITHM FOR LIMITED SPACE SCHEDULING (2001) (65)
- Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain (2004) (62)
- Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry (2015) (59)
- CASE STUDY FOR WORK STRUCTURING: INSTALLATION OF METAL DOOR FRAMES (2000) (58)
- Making design decisions using choosing by advantages (2009) (57)
- LOGISTICS CENTERS TO SUPPORT PROJECT- BASED PRODUCTION IN THE CONSTRUCTION INDUSTRY (2007) (57)
- Improving Construction Work Flow – The Connective Role of Lookahead Planning (2008) (56)
- A knowledge management framework for project definition (2002) (55)
- Consequences of competitive bidding in project-based production (2005) (53)
- Comparison Between Location Based Management and Takt Time Planning (2015) (53)
- Choosing by advantages: A case study for selecting an HVAC system for a net zero energy museum (2016) (51)
- Knowledge-based assembly of simulation networks using construction designs, plans, and methods (1994) (50)
- Look-ahead Planning: Screening and Pulling (1997) (47)
- Boiler Erection Scheduling Using Product Models and Case-Based Reasoning (1997) (47)
- Sightplan: an expert system that models and augments human decision-making for designing construction site layouts (1989) (45)
- Cipros: knowledge-based construction integrated project and process planning simulation system (1992) (45)
- Construction Engineering—Reinvigorating the Discipline (2011) (44)
- Assembly of Simulation Networks Using Designs, Plans, and Methods (1994) (44)
- Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries (2005) (44)
- Selecting Globally Sustainable Materials: A Case Study Using Choosing by Advantages (2016) (44)
- Supply Chain Management for Lean Project Delivery (2008) (44)
- Understanding the role of “tasks anticipated” in lookahead planning through simulation (2015) (43)
- Role of Tolerances and Process Capability Data in Product and Process Design Integration (2003) (43)
- Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork (2004) (43)
- Root Causes of Clashes in Building Information Models (2012) (43)
- Value Stream Mapping for Make-to-Order Products in a Job Shop Environment (2005) (42)
- A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-order Manufacturers (2014) (42)
- Exploration of Set-Based Design for Reinforced Concrete Structures (2007) (42)
- DEVELOPMENT OF A TAKT-TIME PLAN: A CASE STUDY (2014) (40)
- Discrete-Event Simulation of Lean Construction Processes (1997) (38)
- Takt-Time Planning and the Last Planner (2014) (38)
- Set-Based Design: Case Study on Innovative Hospital Design (2008) (37)
- Space Scheduling Using Flow Analysis (1999) (37)
- Product modeling to support case-based construction planning and scheduling (2004) (37)
- Integrating design planning, schedule and control with Deplan (2000) (36)
- Deciding a Sustainable Alternative by Choosing by Advantages' in the AEC industry (2012) (36)
- Decision Analysis Using Virtual First-Run Study of a Viscous Damping Wall System (2009) (36)
- Contribution of Specialty Contractor Knowledge to Early Design (2000) (35)
- Lean hospitals: a new challenge for facility designers (2012) (34)
- Contributors to lead time in construction supply chains: case of pipe supports used in power plants (2002) (33)
- Target Value Design as a Method for Controlling Project Cost Overruns (2014) (32)
- Collaborative Takt Time Planning of Non-Repetitive Work (2017) (32)
- External Change in Large Engineering Design Projects: The Role of the Client (2006) (32)
- Alternative Supply-Chain Configurations for Engineered or Catalogued Made-to-Order Components: Case Study on Pipe Supports Used in Power Plants (2002) (31)
- DESIGN AND SIZING OF SCREW FEEDERS (2001) (30)
- Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization (2017) (30)
- ‘Poka Yoke’ or Quality by Mistake Proofing Design and Construction Systems (2008) (29)
- Upstream Problem Solving Under Uncertainty and Ambiguity: Evidence From Airport Expansion Projects (2008) (29)
- Discussion of ¿Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle¿ by H. Randolph Thomas, Michael J. Horman, R. Edward Minchin Jr., and Dong Chen (2005) (29)
- Discussion of “Reducing Variability to Improve Performance as a Lean Construction Principle” by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavřski (2004) (29)
- REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR (2002) (27)
- Theoretical comparison of alternative delivery systems for projects in unpredictable environments (2004) (26)
- Buffering and Batching Practices in the HVAC Industry (2003) (26)
- Lean Design Management in an Infrastructure Design-Build Project: A Case Study (2010) (26)
- LEVERAGING SPECIALTY-CONTRACTOR KNOWLEDGE IN DESIGN-BUILD ORGANIZATIONS (2001) (26)
- Process Benefits From Use of Standard Products – Simulation Experiments Using the Pipe Spool Model (2006) (26)
- Requirements and Barriers to Adoption of Last Planner Computer Tools (2001) (26)
- SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION (2006) (23)
- Collaborating with a Permitting Agency to Deliver a Healthcare Project: Case Study of the Sutter Medical Center Castro Valley (SMCCV) (2011) (22)
- Materials Handling and Site Layout Control (1994) (22)
- Intelligent HVAC systems in hospitals (2013) (22)
- Comparing Weighting Rating and Calculating vs. Choosing by Advantages to Make Design Choices (2014) (22)
- SOCIAL NETWORK ANALYSIS OF INFORMATION FLOW IN AN IPD-PROJECT DESIGN ORGANIZATION (2013) (21)
- Using 'Choosing by Advantages' to Select Tile From a Global Sustainable Perspective (2013) (21)
- Energy-Related Risk Management in Integrated Project Delivery (2013) (20)
- “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects (2009) (20)
- Application of Lean Supply Chain Concepts to a Vertically-Integrated Company: A Case Study (2004) (20)
- Design Structure Matrix Implementation on a Seismic Retrofit (2010) (20)
- Space-time characterization for resource management on construction sites (1992) (20)
- Comparing Multi-Criteria Decision-Making Methods to Select Sustainable Alternatives in the AEC Industry (2012) (20)
- Application of Tolerance Analysis and Allocation to Work Structuring: Partition Wall Case (2003) (19)
- Qualitative and Quantitative Assessment of 3D-Scanned Bulk Solid Heap Data (2017) (18)
- Lead time reduction via pre-positioning of inventory in an industrial construction supply chain (2002) (18)
- IMPROVING DESIGN FITNESS THROUGH TOLERANCE ANALYSIS AND TOLERANCE ALLOCATION (2002) (18)
- Travel-time simulation to locate and staff temporary facilities under changing construction demand (1999) (18)
- Materials and Information Flows for HVAC Ductwork Fabrication and Site Installation (2000) (18)
- APPLICATION OF TOLERANCE MAPPING IN AEC SYSTEMS (2005) (18)
- Space Schedule Construction (1993) (18)
- USING ‘ CHOOSING BY ADVANTAGES ’ TO SELECT CEILING TILE FROM A GLOBAL SUSTAINABLE PERSPECTIVE (2013) (17)
- Real-time Pallet Localization with 3D Camera Technology for Forklifts in Logistic Environments (2018) (16)
- INTEGRATED PRODUCT-PROCESS DEVELOPMENT BY A LIGHT FIXTURE MANUFACTURER (2001) (16)
- An analysis of several configuration design systems (1993) (15)
- Using Controlled Experiments to Calibrate Computer Models: The Airplane Game as a Lean Simulation Exercise (2008) (15)
- Causes of Rework in California Hospital Design and Permitting: Augmenting an Existing Taxonomy (2009) (15)
- Choosing By Advantages and Rhetoric in Building Design: Relationship and Potential Synergies (2014) (15)
- A knowledge-level analysis of several design tools (1991) (15)
- No More Deadlocks - Applying The Time Window Routing Method To Shuttle Systems (2017) (15)
- Workplan: Database for Work Package Production Scheduling (1998) (15)
- The Economic Theory of Production Conceals Opportunities for Sustainability Improvement (2009) (15)
- Capital Projects Supply Chain Management: SC Tactics of a Supplier Organization (2003) (14)
- Design Structure Matrix (DSM) Implementation on a Seismic Retrofit (2008) (14)
- BIM AND LEAN IN THE DESIGN- PRODUCTION INTERFACE OF ETO COMPONENTS IN COMPLEX PROJECTS (2015) (13)
- Improving the Delivery Process for Engineered-To-Order Products - Lessons Learned from Power Distribution Equipment (2004) (13)
- Formwork System Selection Using Choosing by Advantages (2016) (13)
- WorkMovePlan: Database for Distributed Planningand Coordination (2000) (13)
- A pure neural network controller for double‐pendulum crane anti‐sway control: Based on Lyapunov stability theory (2019) (13)
- Exchanging layout and schedule data in a real-time distributed environment (1993) (13)
- Postponing design processes in unpredictable environments (2004) (12)
- Use of A3 reports to focus design and construction conversations (2009) (12)
- Value propositions for set-based design of reinforced concrete structures (2008) (12)
- Tolerance and Constructability of Soldier Piles in Slurry Walls (2010) (12)
- Using a Systemic Perspective to Support Engineering Change Management (2015) (12)
- Tolerance and Constructability of Soldier Piles in Slurry Walls (2010) (12)
- LOCO: Logistics Objects in Context (2020) (12)
- AN ANALYSIS OF POTENTIAL MISALIGNMENTS OF COMMERCIAL INCENTIVES IN INTEGRATED PROJECT DELIVERY AND TARGET VALUE DESIGN (2015) (11)
- Automated measurement of the numerical angle of repose (aMAoR) of biomass particles in EDEM with a novel algorithm (2021) (11)
- Modeling the Effect of Rework Timing: Case Study of a Mechanical Contractor (2008) (11)
- Altering the SightPlan knowledge-based systems (1992) (11)
- Towards recursive plan-do-check-act cycles for continuous improvement (2014) (11)
- Space Planning Tools for Multi-Story Construction (1996) (11)
- Models of Lean Construction Processes: Example of Pipe-Spool Materials Management (1997) (11)
- RESTRUCTURING THE REBAR SUPPLY SYSTEM (2005) (11)
- Process-Based Cost Modeling to Support Lean Project Delivery (2008) (11)
- Developing a Target Value Design Protocol for Commercial Energy Retrofits—Part 1 (2012) (11)
- Construction Research Congress 2005: Broadening Perspectives (2005) (11)
- Site Layout: Where Should it Go? (1991) (11)
- Improvements in the Routine Depth Profiling of Doping Elements (1984) (11)
- Impact of Variability and Uncertainty on Product and Process Development (2000) (11)
- Interactive Coordination of Distributed Work Plans (2000) (10)
- Takting the Parade of Trades: Use of Capacity Buffers to Gain Work Flow Reliability (2020) (10)
- A Mentoring Approach to Implement Lean Construction (2014) (10)
- Takt Time Planning of Interiors on a Pre-Cast Hospital Project (2016) (10)
- MoveCapPlan: In Integrated System for Planning and Controlling Construction Material Laydown and Handling (1994) (10)
- Developing a Production System on IPD: Considerations for a Pluralistic Environment (2014) (9)
- Time-space tradeoff strategies for space-schedule construction (1994) (9)
- Integration of Lean and Information Technology to Enable a Customization Strategy in Affordable Housing (2017) (9)
- Workload leveling based on work space zoning for takt planning (2020) (9)
- Priority Conversations: A Case Study on Priority Walls (2007) (9)
- Design, Application, and Evaluation of a Multiagent System in the Logistics Domain (2020) (9)
- APPLICATION OF DESIG N RATIONALE SYSTEMS TO PROJECT DEFINITION - ESTABLISHING A RESEARCH PROJECT (2001) (8)
- Sightplan: An Artificial Intelligence Tool to Assist Construction Managers with Site Layout (1989) (8)
- Visual Tool for Workload Leveling Using the Work Density Method for Takt Planning (2020) (8)
- Management Cybernetics as a Theoretical Basis for Lean Construction Thinking (2015) (8)
- Supporting the Implementation of Engineering Change Management with the Viable System Model (2015) (8)
- Towards Fully-Synthetic Training for Industrial Applications (2020) (8)
- Analysis of Variability in Precasting and Installation of Pile Foundations (2005) (8)
- Autonomous Systems in Intralogistics - State of the Art and Future Research Challenges (2021) (7)
- An efficient and reliable method for determining the angle of repose of biomass by using 3D scan (2020) (7)
- Constructing Site Layouts using Blackboard Reasoning with Layered Knowledge (1992) (7)
- Deploying microservices for a cloud-based design of system-of-systems in intralogistics (2017) (7)
- Acknowledging Variability and Uncertainty in Product and Process Development (2003) (7)
- Reducing Rework in Design by Comparing Structural Complexity using a multi domain matrix (2012) (7)
- Comparison of simulation modeling techniques that use preemption to capture design uncertainty (2001) (7)
- Mistakeproofing the Design of Construction Processes Using Inventive Problem Solving (TRIZ) (2018) (7)
- Modeling design development in unpredictable environments (2001) (7)
- Using Design Drawings and Project Plans to Construct Discrete-Event Simulation Networks (1991) (7)
- Explorative Application of the Multi-Domain Matrix Methodology in Lean Design (2010) (6)
- Tolerance Mapping - Partition Wall Case Revisited (2004) (6)
- Visualizing Daily On-site Space Use (2017) (6)
- An International Comparison of the Delivery Process of Power Distribution Equipment (2003) (6)
- CONSIDERATIONS FOR STREAMLINING A VERTICALLY INTEGRATED COMPANY: A CASE STUDY (2001) (6)
- Lean construction for affordable housing: a case study in Latin America (2019) (6)
- Development of an Integrated Facade System to Improve the High-Rise Building Process (2009) (6)
- A Viable System Model Perspective on Variant Management based on a Structural Complexity Management Approach (2014) (6)
- Using Product Models to Plan Construction (1993) (6)
- Modeling and Discretization of Hydraulic Actuated Telescopic Boom System in Port-Hamiltonian Formulation (2019) (6)
- Enhancing intercultural competence of engineering students via GVT(global virtual teams)-based virtual exchanges: An international collaborative course in intralogistics education (2017) (6)
- Cost of Concrete Placement for Contractors (2005) (6)
- MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION (2010) (6)
- Creating Work Structuring Transparency in Curtain Wall Design (2004) (6)
- Impact of multitasking and merge bias on procurement of complex equipment (2003) (6)
- DOMAIN-INDEPENDENT DESIGN SYSTEM Environment/or rapid development of configuration-design systems (1992) (6)
- The Last Designer's CAD-Database for Sourcing, Procurement, and Planning (1998) (6)
- Lean, Psychological Safety, and Behavior-Based Quality: A Focus on People and Value Delivery (2020) (6)
- Industry 4.0 in Logistics and Associated Employee Competencies - A Technology Providers' Perspective (2020) (6)
- Design of an Infrastructure Project Using a Point-Based Methodology (2012) (6)
- Comparison Between the Location Based Management System and Takt Time Planning (2015) (5)
- Routing-based Sequencing Applied to Shuttle Systems (2018) (5)
- Constraint-Based Database for Work Package Scheduling (1998) (5)
- Effects of a Preferred Vendor Relationship on an Electrical Component Supplier and Electrical Contractor - A Case Study (2001) (5)
- Developing a Target Value Design Protocol for Commercial Energy Retrofits - PART 2 (2012) (5)
- Analyzing implementation of lean production control with the Viable System Model (2014) (5)
- Methods for Managing Tolerance Compatibility: Windows in Cast-in-Place Concrete (2020) (5)
- IEEE Technology and Engineering Management Society (2018) (5)
- Control Architecture and Transport Coordination for Autonomous Logistics Modules in Flexible Automated Material Flow Systems (2018) (5)
- Management of Design Detailing Process: Key to Speciality Contractor Performance (1998) (5)
- Using Palm-Top Computers in Teaching Materials Management (1997) (5)
- Supporting Organizational Design Towards Lean with the Viable System Model (2014) (5)
- Architectural Design for Special Load Carriers as Smart Objects in a Cloud-based Service System (2019) (5)
- Design science research in construction management: multi-disciplinary collaboration on the SightPlan system (2020) (5)
- Usage of Autonomous Mobile Robots Outdoors - an Axiomatic Design Approach (2021) (5)
- Visual Management of Daily Construction Site Space Use (2020) (5)
- Activity-level space scheduling (1992) (5)
- A symplectic indirect approach for a class of nonlinear optimal control problems of differential‐algebraic systems (2021) (5)
- Development of a generic simulation method for the time window routing of automated guided vehicles (2017) (5)
- A Vision for the Future of the Computer-Aided Tolerance Management in Construction Based on the Lessons Learned from Manufacturing (2019) (4)
- Management Cybernetics as a Theoretical Basis for Lean Thinking (2013) (4)
- Towards Facility Management Participation in Design: A UCSF Case Study (2018) (4)
- What “Makes” the Last Planner? A Typology of Behavioral Patterns of Last Planners (2016) (4)
- DE-COUPLING CLADDING INSTALLATION FROM OTHER HIGH-RISE BUILDING TRADES: A CASE STUDY (2001) (4)
- Process-Based Cost Modeling Framework and Case Study (2018) (4)
- Slack in Construction - Part 1: Core Concepts (2021) (4)
- Managing Complexity in Lean Construction Design – Using the MDM Methodology to Create Organizational Modularity (2011) (4)
- ANALYSIS OF HVAC SUBCONTRACTOR MECHANISMS FOR JIT MATERIALS SUPPLY TO A CONSTRUCTION SITE (2015) (4)
- Investigation of Buffer Dynamics in Sheet Metal Ductwork Supply Chains (2006) (4)
- Communication and process simulation of set-based design for concrete reinforcement (2007) (4)
- Automating Dynamic Layout Construction (1994) (4)
- Expert Systems for Civil Engineers: Integration Issues (1997) (4)
- Design, simulation and performance of a highly-dynamic, hybrid pallet storage and retrieval system (2020) (4)
- Problem-Solving Base Building under Uncertainty and Ambiguity: Multiple-Case Study on an Airport Expansion Program (2008) (4)
- Formwork Standardization and Production Flow: Lessons From an Affordable Housing Project in Ecuador (2015) (4)
- Domain-Independent Design System (1992) (4)
- How to Increase Crane Control Usability: An Intuitive HMI for Remotely Operated Cranes in Industry and Construction (2019) (3)
- Structural Design Iteration: The Application of DSM to Seismic Retrofit (2009) (3)
- Operating High-Powered Automated Vehicle Storage and Retrieval Systems in Multi-deep Storage (2019) (3)
- An investigation of mean energy demand, performance and reference cycles for stacker cranes (2020) (3)
- Automated Case-Based Scheduling for Power Plant Boiler Erection: Use of Annotated Schedules (1994) (3)
- Failure-Handling Strategies For Mobile Robots In Automated Warehouses (2019) (3)
- Input-constrained chaos synchronization of horizontal platform systems via a model predictive controller (2020) (3)
- New Tools for Site Materials Handling and Layout Control (1995) (3)
- Changing Behaviors Upstream to Achieve Expected Outcomes (2019) (3)
- Vehicle Coordination and Configuration in High-powered Automated Vehicle Storage and Retrieval Systems (2020) (3)
- Product Versus Performance Specification for Wheelchair Ramp Construction (2016) (3)
- Detecting Equipment Activities by Using Machine Learning Algorithms (2021) (3)
- Scheduling Multiple Lift Vehicles in a Common Shaft in Automated Vehicle Storage and Retrieval Systems (2019) (3)
- Calculating the dynamic behaviour of lattice boom mobile cranes during hoisting (2020) (3)
- Implementation, Self-Configuration and Coordination of Logistical Functions for Autonomous Logistics Modules in Flexible Automated Material Flow Systems (2019) (3)
- The Internet of Load Carriers - Design of a Cloud-based Service System for Smart and Connected Load Carriers (2018) (3)
- Target-Setting Practice for Loans for Commercial Energy-Retrofit Projects (2015) (3)
- Digital Twins in Order Picking Systems for Operational Decision Support (2021) (3)
- Evaluation of Remote Crane Operation with an Intuitive Tablet Interface and Boom Tip Control (2020) (3)
- MODELING THE EFFECT OF AN ALTERNATIVE REVIEW PROCESS: CASE STUDY OF A STATE PERMITTING AGENCY (2009) (3)
- Dynamic control of multiple vehicles moving along the same rail in automated vehicle storage and retrieval systems (2020) (3)
- Case storage of planning knowledge for power plant construction (1994) (3)
- Comparing and Implementing Alternative Work Structures - Installation of Door Frames (2002) (3)
- Database Synchronization Technology for Multi-Project Schedule Coordination (2002) (3)
- Supply Chain Management: Interlinking Multiple Research Streams (2005) (2)
- Human Autonomy in Algorithmic Management (2022) (2)
- Mobile Picking Robots: A First Study of the Effects of Human-Robot Interactions in Conventional Order Picking Systems (2021) (2)
- Slack in Construction - Part 2: Practical Applications (2021) (2)
- MDM AS A TOOL TO IMPROVE BIM DEVELOPMENT PROCESSES (2011) (2)
- Simulation-based Performance Analysis in Robotic Mobile Fulfilment Systems - Analyzing the Throughput of Different Layout Configurations (2018) (2)
- Enhanced viability in organizations: An approach to expanding the requirements of the viable system model (2013) (2)
- Competency Model for Logistics Employees in Smart Factories (2019) (2)
- Concept Development and Evaluation of Order Assignment Strategies in a Highly-dynamic, Hybrid Pallet Storage and Retrieval System (2021) (2)
- Improving Organizational Design and Diagnosis by Supporting Viable System Model Application with Structural Complexity Management (2013) (2)
- Towards an Artificial Perception Framework for Autonomous Robots in Logistics (2021) (2)
- Simulation-Based Evaluation Of Reservation Mechanisms For The Time Window Routing Method (2020) (2)
- Modularization: Exploring opportunities for knowledge transfer between the mechanical engineering and construction industry (2017) (2)
- Principles of Mistakeproofing and Inventive Problem Solving (TRIZ) (2019) (2)
- Cyclic Update of Project Scheduling by Using Telematics Data (2021) (2)
- SetPlan: A computer tool to aid in set-based design (2009) (2)
- Development and Evaluation of Configurations and Control Strategies to Coordinate Several Stacker Cranes in a Single Aisle for a New Dynamic Hybrid Pallet Warehouse (2022) (2)
- Cyber Physical Systems: Cyber Security (2015) (2)
- A feasibility study regarding the implementation and application of a two-layer architecture for automated material flow systems (2017) (2)
- MDM as a Tool for Process Improvement in Building Modeling (2011) (2)
- Considering technical details in the planning of tugger train systems (2018) (2)
- DIDS: rapidly prototyping configuration design systems (1994) (2)
- Construction Research Congress 2005 : broadening perspectives : proceedings of the Congress (2005) (2)
- Simulation-based analysis of inventory levels for low demand spare parts in a cooperative inventory pooling-system (2019) (2)
- Investigation of the Dynamic Loads on Tower Cranes During Slewing Operations (2020) (2)
- Managing supply chains during the Covid-19 crisis: synthesis of academic and practitioner visions and recommendations for the future (2022) (2)
- Modeling and Simulation of Generic Handling Operations in In-Plant Milk-Run Systems (2019) (2)
- An Active Caring Approach Through Psychological Safety in Construction Projects (2019) (2)
- High-Capacity Screw Conveyor - Research Project of Krupp Fördertechnik and TU München (1999) (1)
- Variety in Variability in Heavy Civil Engineering (2021) (1)
- Semi-Automatic Pallet Pick-up as an Advanced Driver Assistance System for Forklifts (2019) (1)
- Optimal control of the hydraulic actuated boom system based on port-hamiltonian formulation (2020) (1)
- Future Competency Requirements in Logistics Due to Industry 4.0: A Systematic Literature Review (2021) (1)
- Extreme modeling: modeling design development in unpredictable environments (2001) (1)
- Applicability and Limitations of Change Management for Circular Economy in Manufacturing Companies (2023) (1)
- Study on the Importance of Bed Shape in Combined Dem-Cfd Simulation of Fixed-Bed Biomass Gasifier (2022) (1)
- Analyzing the industrial scalability of backwards compatible intralogistics systems (2018) (1)
- The Process-oriented Digital Twin of Construction Machinery (2020) (1)
- Discussion of “Toward Error Management in Construction: Moving beyond a Zero Vision” by Peter E.D. Love and Jim Smith (2018) (1)
- Influencing factors of the mixing performance of a near-nozzle continuous mixer for 3D concrete printing: An analysis based on spatial Lacey mixing index (SLMI) (2022) (1)
- Optimal Motion Planning of Four-Wheeled Trailer System (2019) (1)
- Development of a method for the energy efficiency determination of stacker cranes in automated high-bay warehouses (2020) (1)
- Social Network Analysis of Information Flow in an IPD-Project (2013) (1)
- Modeling and Simulation of Long Boom Manipulator based on Geometrically Exact Beam Theory (2020) (1)
- Equipment data-based activity recognition of construction machinery (2021) (1)
- Improving Integrated Planning for Offshore O&M Projects With Last Planner® Principles (2015) (1)
- Lean Construction to Manage Project Structural Complexity: The LPDS-MDM Framework (2018) (1)
- Supporting the Design of Competitive Organizations by a Domain-Specific Application Framework for the Viable System Model (2016) (1)
- Cost Reduction Through Vertical Integration of the In-Situ Concrete Supply Chain (2005) (1)
- Managing the “Receding Edge” (2018) (1)
- Construction Project Complexity as Addressed in Traditional versus Lean Project Management Literature (2018) (1)
- Creating dynamic organizational modularity in lean construction design – Combining MDM and DSM methodology systematically (2012) (1)
- Automatic Generation of a Daily Space Schedule (2014) (1)
- Implementation of a Digital Twin Framework in the Modular Housing Industry (2022) (1)
- Dynamics Modelling and Simulation of Super Truss Element based on Non-linear Beam Element (2021) (1)
- Evaluating value generation of rebar delivery processes with DSM (2009) (1)
- Socio-Technical Process Modules for Configuring Current and Future Logistics Processes (2021) (1)
- Consideration Of RFID-Systems In The Factory Planning Process (2021) (1)
- Design of an Intuitive Control Concept for Lifting Operations Using the Example of Forklifts (2020) (1)
- Life cycle phases and design morphology for the implementation of a cooperative inventory pooling-system (2020) (1)
- Slack in production planning and control: a study in the construction industry (2022) (1)
- A model-driven engineering design process for the development of control software for Intralogistics Systems (2022) (1)
- EVALUATING MBSE POTENTIAL USING PRODUCT AND DEVELOPMENT CHARACTERISTICS – A STATISTICAL INVESTIGATION (2020) (1)
- FOR MULTI-PROJECT SCHEDULE COORDINATION by (2010) (1)
- Synergy Between Shuttles And Stacker Cranes In Dynamic Hybrid Pallet Warehouses: Control Strategies And Performance Evaluation (2022) (1)
- Variety in Variability in Heavy Civil Engineering (2021) (1)
- Evaluating Supply-And Reverse Logistics Alternatives in Building Construction Using Simulation (2021) (0)
- Review of the Project Resourcing and Schedule Management (PRSM) System used by Caltrans (2018) (0)
- ARCOM 21st annual conference, SOAS, London (2005) (0)
- Framework to manage project structural complexity (2020) (0)
- CONCURRENT ENGINEERING IN CONSTRUCTION (2002) (0)
- Wisdom from ASCE Construction (2000) (0)
- INSTRUCTIONS FOR FORMATTING YOUR CEC02 PAPER (2002) (0)
- PRSM Review Year 1 Report A: Review of PRSM Use at Caltrans (2017) (0)
- Mistakeproofing Framework and Applications in Civil Engineering Operations and Products (2022) (0)
- Conceptual Structures for Spatial Reasoning (1987) (0)
- Framework for Using A3s to Develop Shared Understanding on Projects (2009) (0)
- USING PRODUCT AND PROCESS FLEXIBILITY TO COPE WITH PROJECT DELIVERY UNCERTAINTY (2005) (0)
- CEPM 3: lead time reduction via pre-positioning of inventory in an industrial construction supply chain (2002) (0)
- So Many Flows! (2022) (0)
- Organizational values in support of leadership styles fostering organizational resilience: a process perspective (2023) (0)
- From Activity Recognition to Simulation: The Impact of Granularity on Production Models in Heavy Civil Engineering (2023) (0)
- Evaluating Supply-And Reverse Logistics Alternatives in Building Construction Using Simulation (2021) (0)
- Takt Planning: An Enabler for Lean Construction (2022) (0)
- Expert Systems for Engineers (1997) (0)
- Development of a knowledge-based Bioremediation Advisor. Symp. (1993) (0)
- Part I: DSM Methods and Complexity Management (2014) (0)
- How a Takt Plan Can Fail: Applying Failure Modes and Effects Analysis in Takt Control (2022) (0)
- Festschrift honouring Dr. Glenn Ballard (2022) (0)
- Introduction: Knowledge-Based Systems and Models for Integration (1997) (0)
- Towards a Construction Site Control System ? Task Management in Construction Operations and Intralogistics (2021) (0)
- LI.:AI) TI.\IE REDUCI'ION VIA PRE-POSITIONING OF INVENTOR\ IN .AN IiiDtJSTRI41. CONSTHL'CTION SUPPLY CHAIN (2002) (0)
- Human-Centered HMI for Crane Teleoperation: Empirical Study on the Operators' Mental Workload (2021) (0)
- Visual collision warning displays in industrial trucks (2018) (0)
- 3D-Concrete Printing – Graded Concrete Extrusion (2022) (0)
- Modifying Value Stream Mapping for the Early Integration of RFID into the Factory Planning Process (2022) (0)
- A comparative study on design standards of screw conveyors in China, Germany and the USA – Part I: Theoretical calculation and quantitative analysis (2021) (0)
- Computing a Realistic Load Collective for the Rail-wheel Contact of Stacker Cranes (2021) (0)
- Model-Based Systems Engineering for the Design of an Intermodal High-Speed Freight Train Terminal (2022) (0)
- Scheduling and Controlling Multiple Vehicles on a Common Track in High-Powered Automated Vehicle Storage and Retrieval Systems (2021) (0)
- Development of a Context-Sensitive Navigation System for In-plant Milk-runs Based on Real-time Localization (2019) (0)
- Buffer Types and Methods of Deployment in Construction (2021) (0)
- A Case Study: Conception of digitalizing prefabrication processes in the construction industry (2022) (0)
- Potentials of Circular Economy Approaches for Supply Chain Resilience (2022) (0)
- Accommodating Employee Preferences in Algorithmic Worker-Workplace Allocation (2022) (0)
- Inconsistency management in heterogeneous engineering data in intralogistics based on coupled metamodels (2023) (0)
- Using modern communication media as a lecture base for engineering students: An international cooperative course in intralogistics planning (2018) (0)
- Multi-Class Object Detection Using 2D Poses (2020) (0)
- Work Density Method for Takt Planning of Construction Processes with Nonrepetitive Work (2022) (0)
- From Activity Recognition to Simulation: The Impact of Granularity on Production Models in Heavy Civil Engineering (2023) (0)
- Importance of secondary processes in heavy equipment resource scheduling using hybrid simulation (2021) (0)
- Analysis of the Screw Flight Wear Model and Wear Regularity of the Bulk Transport in Screw Ship Unloader (2021) (0)
- Method and apparatus for storage of measurement data from partial areas of a sputter crater, which is generated in a mass spectrometer and analyzed sekundaerionen (1983) (0)
- Evaluation model for cooperative inventory pooling-systems (2021) (0)
- INSTRUCTIONS FOR FORMATTING YOUR IGLC-7 PAPER (1999) (0)
- Analysis of the Screw Flight Wear Model and Wear Regularity of the Bulk Transport in Screw Ship Unloader (2021) (0)
- Analyzing the industrial scalability of backwards compatible intralogistics systems (2018) (0)
- Dynamic Simulation of Two Kinds of Hydraulic Actuated Long Boom Manipulator in Port-Hamiltonian Formulation (2019) (0)
- User-Centered Interface Design and Evaluation for Teleoperated Cranes with Boom Tip Control (2022) (0)
- Real-Time Detection of Safety-Relevant Forklift Operating States using Acceleration Data with a Windowing Approach (2021) (0)
- Dynamics of the Spatial Motion of the Long Boom Manipulator Based on Nonlinear Beam Element (2020) (0)
- Deployment of an Distributed Strategic Material Flow Control for Automated Material Flow Systems Consisting of Autonomous Modules (2018) (0)
- Socio-technical Qualification Modules for the Empowerment of Logistics Employees in the Technological Transition (2021) (0)
- Evaluation of a Service System for Smart and Modular Special Load Carriers within Industry 4.0 (2020) (0)
- A Concept for Optimal Warehouse Allocation Using Contextual Multi-Arm Bandits (2023) (0)
- Effect of Fuel Heap Shape on Air Flow in a Side-Fed Biomass Gasifier Based on DEM-CFD Simulation (2018) (0)
- Optimization of the Bottleneck Caused by Stacker Cranes in Dynamic Hybrid Pallet Warehouses and Investigation of the Influence of the Input/Output Area on Performance (2022) (0)
- Real-time Spatial Positioning Network MovePlan : Space Scheduling (2011) (0)
- Key Figure Systems: Backbone of Intelligent Solutions in Future Logistics (2020) (0)
- Structural cooperation models and incentivization for cooperative inventory pooling-systems (2021) (0)
- Circular Transformation Pathways in the Manufacturing Industry: A Systematic Literature Review (2022) (0)
- A Survey of Lunar Cranes and Some Inspiration from the Perspective of Earth Crane Technology (2019) (0)
- Technical Design Approach for Autonomous Outdoor Transport Systems based on an Extension of Axiomatic Design using Metrics (2021) (0)
- Cobot uptake in construction: embedding collaborative robots in digital construction processes (2023) (0)
- Data-Driven Determination and Plausibility Check of Requirement Profiles in Logistics (2021) (0)
- Safety through Perception: Multi-modal Traversability Analysis in rough outdoor environments (2021) (0)
- A Concept for Camera-based Classification of Load Carriers (2021) (0)
- Managing Projects More Successful: Evaluation of a Concept for Implementing Critical Success Factors in Practice (2022) (0)
- Integrated Optimization Of Transportation And Supply Concepts In The Automotive Industry (2017) (0)
- Data driven logistics-oriented value stream mapping 4.0: A guideline for practitioners (2022) (0)
- Systematic Determination of Competency Requirements for Employees in Logistics (2021) (0)
- Developing a Company-Specific Technology Vision for Intralogistics Processes (2022) (0)
- Increasing the reconfigurability of automated material flow systems using an agent-based control approach (2019) (0)
- Life Cycle Assessment of High Bay Clad Racks Made of Wood and Steel (2017) (0)
- Human-Centered HMI for Crane Teleoperation: Intuitive Concepts Based on Mental Models, Compatibility and Mental Workload (2021) (0)
- Using Machine Learning to Predict Accurate Load Collectives for the Rail/Wheel System of Stacker Cranes (2021) (0)
- Knowledge-Based Systems: Past and Near Future (1993) (0)
- Optimization Of Internal Logistics Using A Combined BPMN And Simulation Approach (2022) (0)
This paper list is powered by the following services:
What Schools Are Affiliated With Iris D. Tommelein?
Iris D. Tommelein is affiliated with the following schools: