Suresh Kumar Goyal
#105,940
Most Influential Person Now
Suresh Kumar Goyal's AcademicInfluence.com Rankings
Suresh Kumar Goyalengineering Degrees
Engineering
#2912
World Rank
#3909
Historical Rank
Industrial Engineering
#9
World Rank
#10
Historical Rank
Applied Physics
#448
World Rank
#466
Historical Rank
Download Badge
Engineering
Suresh Kumar Goyal's Degrees
- PhD Industrial Engineering IIT Roorkee
- Masters Industrial Engineering IIT Roorkee
- Bachelors Mechanical Engineering IIT Roorkee
Why Is Suresh Kumar Goyal Influential?
(Suggest an Edit or Addition)Suresh Kumar Goyal's Published Works
Published Works
- Recent trends in modeling of deteriorating inventory (2001) (1327)
- Economic Order Quantity under Conditions of Permissible Delay in Payments (1985) (1310)
- An integrated inventory model for a single supplier-single customer problem (1977) (993)
- “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* (1988) (706)
- A fuzzy multicriteria approach for evaluating environmental performance of suppliers (2010) (518)
- Integrated inventory models: The buyer-vendor coordination (1989) (413)
- A one-vendor multi-buyer integrated inventory model: A comment (1995) (362)
- Note on: Economic production quantity model for items with imperfect quality – a practical approach (2002) (354)
- Buyer vendor coordination models in supply chain management (2006) (325)
- A multi-criteria decision making approach for location planning for urban distribution centers under uncertainty (2011) (295)
- A review of the joint replenishment problem literature: 1989-2005 (2008) (294)
- Determination of economic production-shipment policy for a single-vendor-single-buyer system (2000) (280)
- Optimal pricing and ordering policy under permissible delay in payments (2005) (250)
- Retailer's optimal replenishment decisions with credit-linked demand under permissible delay in payments (2008) (247)
- Determination of Optimum Packaging Frequency of Items Jointly Replenished (1974) (246)
- Models for multi-plant coordination (1993) (231)
- Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing (2014) (205)
- Optimal replenishment policies for non-instantaneous deteriorating items with stock-dependent demand (2010) (196)
- An integrated production-inventory-marketing model for deteriorating items (1995) (188)
- Economic production quantity model for items with imperfect quality subject to learning effects (2008) (186)
- Joint replenishment inventory control: Deterministic and stochastic models (1989) (184)
- The optimal inventory policies under permissible delay in payments depending on the ordering quantity (2005) (180)
- An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity (2009) (173)
- An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment (2000) (159)
- Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers (2008) (155)
- A DEMATEL based approach for investigating barriers in green supply chain management in Canadian manufacturing firms (2018) (149)
- The production-inventory problem of a product with time varying demand, production and deterioration rates (2003) (144)
- Channel coordination and profit distribution in a social responsible three-layer supply chain (2015) (141)
- Optimal ordering policies for a retailer in a supply chain with up-stream and down-stream trade credits (2007) (136)
- An imperfect production process in a volume flexible inventory model (2007) (133)
- A simple integrated production policy of an imperfect item for vendor and buyer (2003) (128)
- A production-inventory model for a deteriorating item with trended demand and shortages (2004) (122)
- Inventory lot-Size Models under Trade Credits: a Review (2008) (115)
- The Finite Horizon Trended Inventory Replenishment Problem With Shortages (1992) (114)
- Determination of Optimum Production Quantity for a Two-Stage Production System (1977) (114)
- On improving the single-vendor single-buyer integrated production inventory model with a generalized policy (2000) (113)
- Determination of Economic Packaging Frequency for Items Jointly Replenished (1973) (112)
- An integrated inventory model with variable lead time, defective units and delay in payments (2014) (98)
- An application of Genetic Algorithm in solving an inventory model with advance payment and interval valued inventory costs (2009) (97)
- A constant lot size model with equal and unequal sized batch shipments between production stages (1986) (97)
- Supplier selection problem for a single manufacturing unit under stochastic demand (2009) (97)
- A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer (2006) (94)
- Improving VAM for Unbalanced Transportation Problems (1984) (88)
- Coordination and profit sharing between a manufacturer and a buyer with target profit under credit option (2007) (85)
- Coordination of a single-manufacturer/multi-buyer supply chain with credit option (2008) (84)
- Scheduling a Multi-Product Single Machine System (1973) (84)
- Optimal ordering policies when the supplier provides a progressive interest scheme (2007) (81)
- Supply-chain coordination under an inventory-level-dependent demand rate (2008) (80)
- Integrated procurement-production systems: A review (1992) (78)
- A Critique of the Literature on Just‐in‐Time Manufacturing (1992) (77)
- A Hybrid Taguchi-Immune approach to optimize an integrated supply chain design problem with multiple shipping (2010) (77)
- An Integrated Inventory Model for a Single Product System (1977) (70)
- Optimal ordering and transfer policy for an inventory with stock dependent demand (2009) (69)
- Supply chain coordination contracts with inventory level and retail price dependent demand (2015) (68)
- Economic batch quantity in a multi-stage production system (1978) (65)
- Economic ordering policy for an item with imperfect quality subject to the in-house inspection (2007) (64)
- A Heuristic for Replenishment of Trended Inventories Considering Shortages (1988) (62)
- OPTIMAL ORDER SIZE TO TAKE ADVANTAGE OF A ONE-TIME DISCOUNT OFFER WITH ALLOWED BACKORDERS (2010) (60)
- A vendor managed inventory model under contractual storage agreement (2013) (56)
- Note-Comment on: A Generalized Quantity Discount Pricing Model to Increase Supplier's Profits (1987) (55)
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” (1976) (55)
- Optimum Ordering Policy for a Multi Item Single Supplier System (1974) (54)
- On a volume flexible inventory model for items with an imperfect production system (2007) (54)
- Determining Economic Maintenance Frequency for a Family of Machines (1985) (53)
- Multi-stage production-inventory systems (1990) (52)
- Discussion A note on ‘The economic ordering quantity for jointly replenishing items’ (1993) (52)
- Optimal cycle time and production rate in a family production context with shelf life considerations (1997) (51)
- One time only incentives and inventory policies (1991) (50)
- A delayed payment method in co-ordinating a single-vendor multi-buyer supply chain (2010) (49)
- Integrating production and quality control policies: A survey (1993) (46)
- An application of genetic algorithm in a marketing oriented inventory model with interval valued inventory costs and three-component demand rate dependent on displayed stock level (2007) (45)
- Incorporating planned backorders in a family production context with shelf-life considerations (2000) (44)
- Economic ordering policy for deteriorating items over an infinite time horizon (1987) (43)
- Nash equilibrium solution in a vendor-buyer supply chain model with permissible delay in payments (2014) (42)
- On "An EOQ model for perishable items under stock-dependent selling rate and time-dependent partial backlogging" by Dye and Ouyang (2006) (42)
- Determining economic maintenance frequency of a transport fleet (1992) (42)
- Total quality management: a new perspective for improving quality and productivity (1998) (42)
- On improving replenishment policies for linear trend in demand (1986) (40)
- An application of tournament genetic algorithm in a marketing oriented economic production lot-size model for deteriorating items (2009) (40)
- An Alternative Procedure for Determining the Optimal Policy for an Inventory Item Having Linear Trend in Demand (1995) (39)
- The Trended Inventory Lot Sizing Problem with Shortages Under a New Replenishment Policy (1996) (39)
- On ‘Joint Vendor–Buyer Policy in JIT Manufacturing’ (1997) (39)
- Analysis of Joint Replenishment Inventory Systems with Resource Restriction (1975) (39)
- The joint replenishment problem involving multiple suppliers offering quantity discounts (2008) (39)
- Simulation for analysis of scheduling rules for a flexible manufacturing system (1995) (38)
- A Note on “Multi-Product Inventory Situations with One Restriction” (1978) (37)
- Resolution of Degeneracy in Transportation Problems (1988) (37)
- The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers: A Comment* (1992) (36)
- Waiting line model applications in manufacturing (1998) (35)
- $$(Q,r,L)$$(Q,r,L) model for stochastic demand with lead-time dependent partial backlogging (2015) (34)
- A comprehensive note on: An inventory model under two levels of trade credit and limited storage space derived without derivatives (2009) (34)
- Determination of a Supplier's Economic Ordering Policy (1987) (33)
- Scheduling a multi-product single machine system A new approach (1975) (33)
- A consolidated delivery policy of multiple suppliers for a single buyer (2009) (32)
- An EOQ Model with Substitutions between Products (1996) (32)
- An integrated inventory model involving manufacturing setup cost reduction in compound Poisson process (2011) (32)
- Economic ordering policy during special discount periods for dynamic inventory problems under certainty (1990) (32)
- Economic ordering policy for jointly replenished items (1988) (31)
- Effect of Dynamic Process Quality Control on the Economics of Production (1990) (28)
- Optimal replenishment and credit policy in EOQ model under two-levels of trade credit policy when demand is influenced by credit period (2012) (28)
- An investigation into the application of group technology in advanced manufacturing systems (1994) (26)
- A Note on the Paper: An Inventory Model with Finite Horizon and Price Changes (1979) (26)
- Short communicationA note on the economic replenishment interval for an item with a linear trend in demand (1986) (26)
- Determination of economic production quantities for a two-product single machine system (1984) (25)
- Reengineering the supply chain in a paint company (2006) (25)
- Comment on ‘Optimal inventory replenishment policy for the EPQ model under trade credit derived without derivatives’ (2009) (24)
- Determination of the optimal production policy and product recovery policy: The impacts of sales margin of recovered product (2011) (23)
- Vendor-Managed Inventory model for single-vendor single-buyer Supply Chain (2011) (22)
- On optimal partially integrated production and marketing policy with variable demand under flexibility and reliability considerations via Genetic Algorithm (2007) (22)
- Lot Size Scheduling on a Single Machine for Stochastic Demand (1973) (22)
- Scheduling of a Two-machine Flowshop with Processing Time Linearly Dependent on Job Waiting-time (1989) (22)
- Evolutionary stability of auction and supply chain contracting: An analysis based on disintermediation in the Indian tea supply chains (2010) (21)
- Safety Stocks in JIT Environments (1994) (21)
- On 'Manufacturing batch size and ordering policy for products with shelf lives' (2002) (21)
- Coordination of a two-level supply chain (manufacturer–retailer) with permissible delay in payments (2016) (21)
- Some notes on the optimal production stopping and restarting times for an EOQ model with deteriorating items (2001) (20)
- Single item optimal lot sizing under continuous unit cost decrease (2006) (20)
- A basic model for co-ordinating a four-level supply chain of a product with a vendor, multiple buyers and tier-1 and tier-2 suppliers (2009) (20)
- A simple rule for determining replenishment intervals of an inventory item with linear decreasing demand rate (2003) (20)
- Job-shop sequencing problem with no wait in process (1975) (20)
- Production policy for ameliorating/deteriorating items with ramp type demand (2013) (19)
- A method for improving joint replenishment systems with a known frequency of replenishment orders (1973) (19)
- Investigating Organizational Characteristics for Sustainable Supply Chain Planning Under Fuzziness (2014) (19)
- Modelling and analysis of just-in-time manufacturing systems (1993) (19)
- A Note on "Inventory Models with Cost Increases" (1992) (18)
- A Vendor′s View of the JIT Manufacturing System (1989) (17)
- Production lot sizing model with insufficient production capacity (1996) (16)
- Determining the optimum production-packaging policy for jointly replenished items (1989) (16)
- Quality and productivity improvement of executive decisions in maintenance engineering: an ESS-based approach (2007) (16)
- Determining economic replenishment intervals for linear trend in demand (1994) (15)
- An integrated vendor-buyer inventory model with defective items and partial backlogging (2011) (15)
- A Note on Formulation of the Multi-Item Single Supplier Inventory Problem (1982) (14)
- Multi-item inventory grouping with dependent set-up cost and group overhead cost (1986) (14)
- On lot streaming in multistage production systems (2005) (14)
- Three Six Sigma transitions and organisational preparedness exercise – today's imperatives for tomorrow's success (2005) (13)
- Lot-streaming policy for forward–reverse logistics with recovery capacity investment (2013) (12)
- On Improving Silver's Algorithm for the Joint Replenishment Problem (1985) (12)
- A NOTE ON EFFECT OF PRODUCTION COST OF SHELF LIFE'. DISCUSSION (1994) (12)
- A comment on Chang and Dye (1999): EOQ model for deteriorating items with time-varying demand and partial backlogging (2001) (12)
- A note on: Optimal ordering policies in response to a discount offer (2006) (12)
- Integrated procurement- production system in a just-in-time environment-modelling and analysis (1997) (12)
- A note on: On controlling the controllable lead time component in the integrated inventory models (2003) (11)
- Technical Note - Economic Packaging Frequency for Items Jointly Replenished (1973) (11)
- Equipment Selection Problems in Just-in-Time Manufacturing Systems (1993) (11)
- Production capacity planning and control in multi-stage manufacturing (1998) (10)
- On “Economic Order Quantity under Conditions of Permissible Delay in Payments” by Goyal: Reply (1985) (10)
- An alternative simple solution algorithm of an inventory model with fixed and variable lead time crash costs under unknown demand distribution (2009) (10)
- An Optimal Method for a Deterministic Joint Replenishment Inventory Policy in Discrete Time (1995) (10)
- An inventory model with Weibull demand rate, finite rate of production and shortages (2006) (10)
- A simple heuristic method for determining economic order interval for linear demand (1987) (10)
- Reducing Inventory Costs and Choosing Suppliers with Order Splitting (1993) (10)
- Economic order quantity model for imperfect lot with partial backordering under the effect of learning and advertisement dependent imprecise demand (2017) (10)
- A Note on the Paper: On the Flow-Shop Sequencing Problem with No Wait in Process (1973) (9)
- Note on: "An optimal batch size for a production system operating under a just-in-time delivery system" (2001) (9)
- A single-vendor single-buyer supply chain under conditions of permissible delay in payments (2010) (9)
- Two-stage supply chain coordination through credit option in asymmetric information environment (2008) (9)
- A conceptual framework for the implementation of Zero Inventory and Just‐In‐Time manufacturing concepts (1998) (9)
- Production planning and control in automated manufacturing systems (1993) (9)
- A simple procedure for price break models (1995) (8)
- Coping with uncertainties in production planning through fuzzy mathematical programming: application to steel rolling industry (2015) (8)
- Dilemma of rented warehouse and shelf for inventory systems with displayed stock level dependent demand (2013) (8)
- A Model for Integrated Procurement-Production Systems (1990) (8)
- A dynamic programming algorithm for joint replenishment under general order cost functions (1987) (8)
- Integrating marketing and production decisions (1989) (8)
- A Note on a Heuristic for Obtaining an Initial Solution for the Transportation Problem (1991) (8)
- A note on the economic replenishment interval for an item with a linear trend in demand (1986) (8)
- Establishing a strategic framework for improving productivity (1996) (8)
- A simple time-cost tradeoff algorithm (1996) (8)
- Economic ordering policy for deterministic two-echelon distribution systems (1991) (8)
- Electronic procurement and manufacturing strategic objectives (2005) (7)
- Scheduling a Single Machine System: A Multi-product Multi-item Case (1975) (7)
- Economic Packaging Frequency of Jointly Replenished Items having Interdependent Packaging Set-up Cost (1976) (7)
- Determining economic inventory policies in a multi-stage just-in-time production system (1993) (7)
- Comment on A Dynamic Programming Approach for Joint Replenishment Under General Order Cost Functions (1987) (7)
- Some comments on ‘Inventory models with fixed and variable lead time crash costs consideration’ (2004) (6)
- An Alternative Approach for Determining Economic Production Quantity in a Two-Stage Production System — A Rejoinder (1979) (6)
- Note on “An Optimal Recursive Method for Various Inventory Replenishment Models with Increasing Demand and Shortages” by Teng et al. (2000) (6)
- Economic packaging frequency for finite horizon inventory problems (1975) (6)
- Vendor managed inventory models for single-vendor multi-retailer supply chains with quality consideration (2014) (6)
- Coordination through a quantity-incentive mechanism in a single-manufacturer-single-retailer supply chain (2009) (6)
- The resource constrained multi-item inventory problem with price discount: a geometric programming approach (1995) (6)
- Two methods for the analysis of a joint replenishment system with known order frequencies (1974) (6)
- Modelling the Turnover Rate of a Production System as a Performance Indicator (1992) (5)
- Determination of economic packaging frequency in a multi-brand joint replenishment inventory system (1980) (5)
- Multi-level lot-sizing in a rayon yarn company: A case study (1993) (5)
- Optimal Decision Rules for Producing Greeting Cards (1973) (5)
- A simulation model for parts selection and routing in manufacturing systems (2009) (5)
- Stochastic inventory model with finite production rate and partial backorders (2014) (5)
- Some findings on joint replenishment of items with stochastic demand and backordering (1988) (5)
- Vendor Managed Inventory models under contractual agreement (2012) (5)
- Economic packaging frequency of two items jointly manufactured in a multi-stage system (1978) (5)
- Note---Note on “Determination of Optimum Packaging Frequency of Items Jointly Replenished” (1975) (5)
- Retailer's replenishment policy under supplier credit linked to payment time (2007) (4)
- Economic Packaging Frequency of Perishable Jointly Replenished Items (1977) (4)
- Improving lot sizing decisions based on heuristic methods (1986) (4)
- Optimization of the decentralized cash management problem (1985) (4)
- Analysis of integrated procurement — production systems using mathematical and simulation modelling approaches (1991) (4)
- Hybrid lot-size coordination in a single-manufacturer-multiple-retailer system (2009) (4)
- A simple algorithm for determining the optimum policy for jointly replenished items (1987) (4)
- A Note on Optimal Inventory Rule for a Linear Trend in Demand with a Constant Replenishment Period (1981) (4)
- A Note on ‘Economic order quantities and variations in production load’ by S. Axsäter (1981) (4)
- Offshore outsourcing of information technology enabled supply chain functions: a transaction cost analysis (2005) (4)
- Vendor-managed inventory models for items with imperfect quality (2013) (4)
- Design of optimal configuration for a multi-stage production system (1993) (4)
- Economic Order quantity under Conditions of a One-Time-only Extended permissible Delay Period in Payments (2008) (4)
- A comment on: A note on the EOQ-JIT relationship (1993) (4)
- Determination of Economic Packaging Set-Up Frequency of Jointly Replenished Items: A Classroom Approach (1988) (4)
- Synchronisation of order cycles of multiple buyers in a supply chain with trade credit policy (2016) (4)
- A Decision Rule for Producing Christmas Greeting Cards (1974) (3)
- An EOQ model with trade credit period depending on the ordering quantity (2008) (3)
- Observation on: A genetic algorithm for solving a fuzzy economic lot-size scheduling problem (2007) (3)
- An EOQ Model for Deteriorating Items with Shortages and a Linear Trend in Demand — A Comment (1992) (3)
- Another Example of When Partial Stockouts are Economically Optimal (1987) (3)
- Implementation of zero inventories and just-in-time production concepts in Chinese manufacturing organizations (1991) (3)
- Improving the solution of a finite horizon inventory problem under certainty (1977) (3)
- An integrated cutting tool life, batch quantity model (1975) (3)
- A note on «determination of coordinated maintenance scheduling frequencies for a group of machines (1985) (3)
- Manpower planning for maintenance jobs in process industries (1993) (3)
- A comment on ‘A new method for joint replenishment problems’ by Fung and Ma (2002) (2)
- Optimal production stopping and restarting times for an EOQ model with deteriorating items. A commentary on Yan and Cheng (1998). J Opl Res Soc49: 1288-1295 (2001) (2)
- Design of flexible capacity plan for multiple items in a single production facility (2010) (2)
- An improved heuristic for a batch production system under linearly increasing time-varying demand (2004) (2)
- Economic scheduling of a new order in a job-shop production system (1994) (2)
- Equipment selection problems in JIT manufacturing systems (1993) (2)
- An integrated cutting speed dispatch policy model (1978) (2)
- Observation on the economic lot scheduling problem: Theory and practice (1997) (2)
- On continuous review stock control with multiple suppliers and non-negative lead times with special emphasis on erlang distribution (2004) (2)
- A Comment on “Lot Sizes for One-Time-Only Sales” (1986) (2)
- Economic production of a product and replenishment of its raw materials (1991) (2)
- On Determining Order Quantities with a Linear Trend in Demand (1984) (2)
- Optimal two-stage production-inventory policy with whole lot and split lots (1995) (2)
- The economics of two-pass machining operations (1985) (2)
- A factual comment on the erratum to "incorporating transportation cost in the lot size and pricing decisions with downward sloping demand" (2007) (2)
- Replenishment decisions under two-level credit policy for flexible credit linked demand (2013) (2)
- Note on: an optimal batch size for a production system operating under periodic delivery policy (2003) (2)
- Author's Reply to Vergin's Note on the Paper “Lot Size Scheduling on a Single Machine for Stochastic Demand” (1976) (2)
- Joint ordering of two products with lost sales permitted (1989) (2)
- Economic operating policy and variations in production load (1983) (2)
- Technical Paper Response: Determination of Manufacturing Cycle Time in Multi‐stage Production Systems (1989) (2)
- Optimization of a multi-stage production-inventory system with significant set-up operation time (1991) (2)
- Determination of maintenance schedule and process mean of production system (2016) (2)
- A unified EPQ model for packaging two items jointly manufactured through several stages (1981) (2)
- Synchronising marketing and supply chain management policies for improving system performance (2013) (2)
- An Algebraically Derived Minimal Cost Solution Technique of the Integrated Vendor-Buyer Problem (2005) (2)
- Waiting model applications in manufacturing (1998) (2)
- Effect of machine failures in a multi-stage multi-facility and multi-product production-inventory system (1991) (2)
- Integrating production and quality control policies (1993) (2)
- On ‘Optimal production policy with shelf life including shortages’ (2006) (2)
- A model for integrated production-packaging systems (1995) (1)
- Economic Ordering Policy for Deteriorating Items (1984) (1)
- A Note on Economic Order Quantities with Inflation (1976) (1)
- A factual comment on "Joint economic lot size in distribution system with multiple shipment policy" (2007) (1)
- Effects of cycle time on integrated procurement-production systems - Sensitivity analysis (1992) (1)
- Composite sourcing policy for multiple products on a single production facility (2011) (1)
- A Comment on An Economic Order Quantity Model for Items with Two Levels of Storage for a Linear Trend in Demand (1993) (1)
- Discussion: A note on ‘Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate’ (1996) (1)
- On the Correct Interpretation of Shadow Prices in Linear Programming (1984) (1)
- Determination of confidence intervals for the economic tool life (1987) (1)
- Determination of economic production quantity in a multi-stage production system (1994) (1)
- Economical production and transshipment policy for coordinating multiple production sites (2012) (1)
- A Comment on “Economic Order Quantity under Conditions of Permissible Delay in Payments”: Response (1988) (1)
- Determining Economic Batch Sizes for Multiple Items in a Multilevel Manufacturing System (1993) (1)
- A Note on “The Effect of Payment Rules on Ordering and Stockholding in Purchasing” (1984) (1)
- Discontinuous optimization in a class of multi-stage production systems (1994) (1)
- A Note on Solving Unbalanced Transportation Problems (1989) (1)
- Lot-streaming policy for forward–reverse logistics with recovery capacity investment (2013) (0)
- INTEGRATING MAINTENANCE LOT SIZING AND PRODUCTION PLANNING FOR A SINGLE MACHINE MULTI-PRODUCT SYSTEM (2001) (0)
- When this condition was applied to Phelps's solution,* then for / = 1 the above con? (2016) (0)
- A comment on "Inventory replenishment with interdependent ordering costs: An evolutionary algorithm" (2008) (0)
- A Method for Improving the Solution of an Inventory Problem under Certainty (1977) (0)
- O.R. or Lack of IT in India (1986) (0)
- A Comment on a Two-Product, Single Machine, Storage-Constrained Production Problem (1992) (0)
- Graphical Aids for Scheduling a Multi-product Single Machine System (1976) (0)
- Optimal Resource Allocation in Developing Economies (1982) (0)
- A factual observation on "Effective and simple EOQ-like solutions for stochastic demand periodic review systems" (2008) (0)
- Transportation Problem with Contractor Selection (1993) (0)
- Supply Management Under the Limitation on Production Rates (2009) (0)
- A Note on the Paper: A Simple Method of Assigning Projects to Students (1973) (0)
- Economic Growth Versus Population (2016) (0)
- Queueing models in the design and operations of manufacturing systems (1994) (0)
- Determination of Economic Production Policy with Dynamic Demand and Production Capacity Constraint (1985) (0)
- A modification of Silver's algorithm for the joint replenishment problem (1987) (0)
- A note on 'Some models for understanding the cooperation between the supplier and the buyer' (2002) (0)
- A Critical Assessment of the Modelling and Analysis of Just-In-Time Manufacturing Systems (1993) (0)
- ON SOLVING AN UNBALANCED TRANSPORTATION PROBLEM (1985) (0)
- A Heuristic Scheduling Procedure for the Two Product, Single-Machine Lot Size Problem (2009) (0)
- Bibliography of inventory literature, vol. I, II and III (1990) (0)
- A Comment on “Stock Replenishment Quantity for Unbounded Linear Increasing Demand: An Interesting Consequence of the Optimal Policy” (1986) (0)
- Two heuristic methods for grouping inventory items (1984) (0)
- A Comment on: “Cost Comparisons for Out-of-Phase Inventory Models” (1987) (0)
- Corrigendum (2003) (0)
- Retailer's lot-sizing policy under partially funded permissible delay in payments (2008) (0)
- A Note on ‘Optimal Ordering Policy for a Multi-Item, Single-Supplier System with Constant Demand Rates’ (1990) (0)
- A note on 'Some models for understanding the cooperation between the supplier and the buyer' (2001) (0)
- A Note on Analysis of Joint Replenishment Inventory Systems with Resource Restriction (1982) (0)
- Addendum to: "Determining economic replenishment interval for linear trend in demand [Int. J. Production Economics 34 (1994) 115-117] (1995) (0)
- Comments on `Joint Vendor‐Buyer Policy in JIT Manufacturing' (1997) (0)
- Optimal three stage production sequencing with setup times (1988) (0)
- Determining replenishment policy of a trended inventory item with permitted shortages (1991) (0)
- Comment on Goyal's “Improving Vam for Unbalanced Transportation Problems”: Reply (1986) (0)
- Short CommunicationA note on: Optimal ordering policies in response to a discount offer☆ (2006) (0)
- An alternative heuristic solution technique for efficient management of the serial supply chain (2008) (0)
- Multi-stage production system: modelling and analysis using simulation (1999) (0)
- Reply to Comment on an Improved Procedure for the Finite Horizon and Price Changes Inventory Model (1980) (0)
- Comment on Viswanathan's note (1995) (0)
- Composite sourcing policy considering raw-material consumption (2012) (0)
- Capacity planning and lot-sizing in a multi-stage production system (1998) (0)
This paper list is powered by the following services:
What Schools Are Affiliated With Suresh Kumar Goyal?
Suresh Kumar Goyal is affiliated with the following schools: